DC Mini UPS 110V 220V Input 5V 9V 12V 2A 15V 24V 1A DC Output
Guangdong, China
Last Login Date:
Jul 02, 2025
Business Type:
Manufacturer/Factory
Main Products:
UPS, Inverter, Line Interactive UPS, Offline UPS, Uninterruptable Power Supply, Mini DC UPS, Online UPS
Product Description
Company Info
Basic Info.
Product Description
item | value |
Warranty | 1 year |
Place of Origin | China |
Guangdong | |
Brand Name | OEM |
Model Number | POE1788L |
Phase | Single Phase |
Protection | Short Circuit |
Weight | 0.4KG |
Type | Line Interactive |
Application | COMPUTER |
Product name | Line Interactive UPS |
Capacity | 17W |
Battery Type | Lithium |
Wave Form | Simulated Sine Wave |
Certification | CE ISO9001 |
Color | Black |
Transfer Time | 2-6ms |
Input voltage | 100-240VAC |
Warranty | 12 Months |
Battery | 2200mahx4 Lithium Battery |
Our market
We have customers more than 120 countries.
including U S A, Europe, South Africa, Middle East, Mexico, Brazil, Argentina, Poland, Spain, Portugal, Bangladesh, Nigeria, Singapore etc.
We also welcome O E M and O D M customers. Whether selecting a current product from our catalog or seeking engineering assistance for your application, you can talk to us about your sourcing requirements.
Fenice Power Co., Ltd is a professional manufacturer with 20 years of experience designing and power products. We established a complete quality system ranging from materials, production, and assembling to testing. Most of our products have been certified to meet international safety standards, such as CE(LVD/EMC), and BIS.
1. 100% OEM/ODM manufacturer/factory in UPS and Inverter industry?
---Yes, completely
2. Logo can be printed on the ups?
---Yes
3. Color box can be customized?
---Yes
4. Is Small Order can be accepted?
Yes, but the prices are different. Generally, MOQ:500 pieces
5. Waveform of your line interactive ups?
---Simulated sine wave or modified sine wave
6. Waveform of your online ups?
---Pure sine wave
7. How about the quality?
---Top 10 in Shenzhen, China
8. Leading time?
---Sample: 2 days; mass order: 22 days